![]() The next section of the form is a risk assessment, which ensures that all of the potential risks are understood and have been accounted for and mitigated to the best of everyones ability. ![]() A description of the load and load weight.The safe work method statement reference number (SWMS).The duration of the planned lift or lifts.The work area where the lift will take place B.15 Mobile Crane Lift Planning Sheet Description of lift: Man & Materials below 3 Ton Location: Area 3 and 4 Permit to work Number Generic Lift plan No.2018-5631-04 Risk assessment No. The tasks to be performed, together with the configuration of the crane at the end of.The penalties and repercussions of not complying with safety rules and regulations can be serve - not to mention that poor record keeping often costs companies hundreds of thousands or millions of dollar in unfair claims which they don't have the evidence or proof to dispute.įor this reason, each and everyone of your records should be appropriately designed, marked and stored for safe and comprehensive record keeping.Įvery lifting permit should include a number of basic information items: There are two main purposes for your lifting permit - both of which need to be accounted for in the contents of your lifting permit.įirstly, lifting permits are for safety record keeping and compliance. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |